Driveway & patio calculators

Surfacing a driveway, patio, or walkway? Estimate pavers and their base, asphalt, gravel, and the sealer to protect it — with quantities and cost.

Choosing and sizing a surface

The big decision is the material: gravel is cheapest and easiest, asphalt and concrete are durable hard surfaces, and pavers cost the most but look the best and are repairable. Whatever you choose, a compacted base underneath is what makes it last — so size the base and bedding along with the surface. Asphalt driveways also need periodic sealing to stay flexible and waterproof.

Which calculator do I need?

The base is what lasts

Whatever the surface, a driveway or patio is only as good as the compacted base beneath it — most failures (sinking pavers, cracked asphalt, rutted gravel) are base failures, not surface problems. Plan 4–6 inches of compacted crushed stone (more in clay or freeze-thaw climates, and far more for vehicles), slope everything about ¼ inch per foot for drainage, and add edge restraint to keep pavers or gravel from spreading. New asphalt should cure 6–12 months before its first sealcoat, then be resealed every few years.

Frequently asked questions

Which surface is cheapest?
Gravel, then asphalt, then concrete, with pavers at the top. See our cost to pave a driveway guide for ranges.
How much base under pavers?
About 4–6 in of compacted crushed stone plus ~1 in of bedding sand. The paver base calculator gives exact amounts.
Asphalt or concrete for a driveway?
Asphalt is cheaper and easy to repair but needs sealing (~15–20 yr life); concrete costs more and lasts longer (25–30+ yr). Asphalt flexes better in freeze-thaw climates.
How thick should a gravel driveway be?
About 4 inches of surface stone over a deeper compacted base, laid and tamped in layers — total 6–10 inches for a durable drive.
How often should I seal an asphalt driveway?
Every 2–3 years, after letting new asphalt cure 6–12 months first. The driveway sealer calculator sizes the pails.

Related guides