Shower Pan Mud Calculator

Find out how much deck mud (dry-pack mortar) you need to build a shower pan — pre-slope, top bed, or both — in 60 lb bags or a mix-your-own sand-and-cement list, plus an estimate of the cost.

How to measure volume — length, width, and depth Length Width Depth
Measure the shower floor — length × width — and the average mud-bed thickness. The bed slopes about 1/4 inch per foot down to the drain.

How much mud do I need for a shower pan?

A traditional tile shower floor is built on deck mud — also called dry-pack, floor mud, or a mortar bed. It's a stiff, barely-damp blend of sand and Portland cement (no gravel) that you pack down and screed to a smooth slope. Because it's placed by volume, the estimate is simple:

Bags = (floor area × average thickness) ÷ yield per bag, rounded up

The one trick is that a shower bed is sloped, not flat — it falls about 1/4 inch per foot toward the drain so water runs out. So we work from an average thickness rather than a single depth. Pick what you're building above and the calculator sets a typical average; adjust it if your pan is thicker or thinner.

Deck mud coverage by thickness

A 60 lb bag of sand-topping mix yields about 0.5 cubic feet. Here's how far that goes at different bed thicknesses — the thicker the bed, the less area a bag covers.

Average thicknessCoverage per 60 lb bagBags per 10 sq ft
1/2″ (feathered pre-slope)~12 sq ft~1
1″ (pre-slope)~6 sq ft~2
1 1/2″ (top bed)~4 sq ft~3
2″~3 sq ft~4
2 1/2″ (full pan)~2.4 sq ft~5

Yields are for bagged sand-topping mix. Mixing your own from loose sand gives similar volume — see below.

Pre-slope vs. top bed — the two layers

A code-correct traditional shower pan is built in two mud layers with a waterproof liner sandwiched between them:

  • Pre-slope — the first bed, poured on the subfloor and sloped 1/4″ per foot to the drain. The liner sits on top of it so any water that gets through the tile drains to the weep holes instead of pooling. It averages about 1 inch.
  • Top bed — the second bed, packed over the liner and clamping drain, also sloped to the drain. This is what you set tile on. It's a minimum of about 1 inch at the drain and averages around 1 1/2 inches.

Choose Full pan for both layers (the default), Top mortar bed only if you're building a single sloped bed over a topical membrane like Schluter Kerdi or a RedGard-coated base, or Pre-slope only to estimate just that first layer.

Mix your own deck mud (5:1)

Deck mud is cheap to mix yourself: about 5 parts mason's sand to 1 part Portland cement by volume, with just enough water that a squeezed handful holds together without dripping (think damp sandcastle, not soup). The finished, packed volume is roughly equal to the loose sand you start with, so the calculator estimates:

  • Sand ≈ the mud volume — about 0.5 cu ft per 50 lb bag of sand.
  • Portland cement ≈ one-fifth of that by volume — a 94 lb bag is 1 cubic foot, so a typical shower needs only part of a bag (we show it in pounds).

Bagged sand-topping mix is the same idea pre-blended — handy for small pans; mixing your own is cheaper once you're buying several bags.

Tips for a solid shower pan

  • Mix it dry. Deck mud should pack like a snowball and hold a sharp edge — too wet and it won't hold the slope or compact properly.
  • Pack, then screed. Tamp the mud firm, then strike it off to your slope with a straightedge. Compaction is why we add a waste allowance — loose mix shrinks as you pack it.
  • Protect the weep holes. On a liner pan, keep gravel or pea stone around the weep holes in the clamping drain so the top bed can still drain.
  • Don't skip the pre-slope. A flat bed under the liner traps water against it — the pre-slope is what keeps the pan dry and is required by code.
  • Let it cure. Give the bed about 24–48 hours before setting tile so it's firm and dry on top.

Frequently asked questions

How much deck mud for a shower pan?
For a standard 36×36″ full mortar pan (pre-slope + top bed, ~2.5″ average), about 5 bags of 60 lb sand-topping mix. A 48×36″ pan needs about 6. If you're only building a top bed over a membrane, a 36×36″ shower takes about 3 bags.
How thick is a shower mortar bed?
It's sloped — a minimum of about 1″ at the drain, rising 1/4″ per foot toward the walls. A full traditional pan (pre-slope + top bed) averages about 2–2.75″; a single bed over a topical membrane averages about 1.5″.
Can I use concrete or thinset instead?
No. Bagged concrete has gravel that prevents a smooth screeded slope, and thinset is a tile adhesive, not a bed. Use deck mud — sand-topping mix or your own 5:1 sand-to-Portland blend.
Sand-topping mix or mix my own?
Sand-topping mix is the same sand-and-cement blend pre-bagged — easiest for one small pan. Mixing your own 5:1 from loose sand and a bag of Portland is cheaper once you need several bags. The volume comes out about the same.

How we calculate this

  • Deck mud volume = shower floor area × average bed thickness, plus a waste-and-compaction allowance
  • A 60 lb bag of sand-topping (deck mud) mix yields about 0.5 cu ft; a full pre-slope-plus-top-bed pan averages ~2–2.75 in thick, a single top bed ~1.5 in
  • Mix-your-own assumes 5 parts sand to 1 part Portland cement by volume; the bed slopes 1/4 in per foot to the drain

A shower pan has to be waterproof — follow your liner or membrane maker’s instructions, always slope the pre-slope under the liner, and have any doubt about the waterproofing checked before you tile.

Sources: TCNA shower-receptor guidelines, sand-topping mix yields, and standard dry-pack mortar practice. Last reviewed: June 2026. See our methodology for how we build every estimate.