Concrete Calculator

Work out how much concrete you need for a slab, footing, or pad — in cubic yards, cubic feet, and bags — plus an estimate of the cost.

Run a website? Embed this calculator on your site, free →

How to measure volume — length, width, and depth Length Width Depth
Measure length, width, and depth (thickness).

How to calculate concrete

Concrete is ordered by volume, in cubic yards. The formula is:

Cubic yards = length × width × thickness ÷ 27 (all measurements in feet)

Because thickness is usually given in inches, divide it by 12 to convert to feet first. The calculator does the conversion for you, adds your waste allowance, and also shows how many bags it would take if you're mixing by hand.

Common slab thicknesses

ProjectTypical thickness
Walkways and patios4 in
Driveways (cars)4–5 in
Driveways (heavy vehicles)6 in
Shed and garage floors4–6 in

How many bags of concrete do you need?

A cubic yard is 27 cubic feet, and each bag yields only a fraction of that — which is why bags add up so fast on anything but a small job:

Bag sizeYieldBags per cubic yardCovers at 4 in
40 lb~0.30 cu ft~90~0.9 sq ft/bag
60 lb~0.45 cu ft~60~1.35 sq ft/bag
80 lb~0.60 cu ft~45~1.8 sq ft/bag

Bags vs. ready-mix

  • Small jobs. For posts and small pads, bagged mix is convenient — but it adds up fast, at about 45 80-lb bags per cubic yard.
  • Larger pours. At roughly a cubic yard or more, ready-mix delivery is usually cheaper and dramatically less work.
  • Order extra. Add 5–10% — you can't pause a pour to run to the store.

Planning a slab? Read our guide on how much concrete you need for a slab, or compare bags vs. ready-mix concrete.

Don't forget the base and reinforcement

A lasting slab is more than concrete. Plan for a compacted gravel sub-base (usually about 4 inches of crusher run) for drainage and support, and reinforcement — rebar or welded wire mesh — for any slab that will carry vehicles or heavy loads. Cut or tool control joints to steer the inevitable cracking, and on garage or living-space slabs add a poly vapor barrier underneath.

How much does concrete cost?

Ready-mix concrete runs about $120–$170 per cubic yard delivered, but watch for a short-load fee on small orders (typically under 4–5 yards) that can add $50–$150. Bagged mix works out far more expensive per yard once you tally the bags, so the crossover to ordering a truck comes quickly — usually around a cubic yard.

Pouring and finishing a slab

  1. Form and prep. Build level forms, compact a gravel base, add a vapor barrier and reinforcement, and dampen the subgrade so it doesn't pull water from the mix.
  2. Pour and spread. Place concrete from the far corner back, working it into the edges so there are no voids.
  3. Screed. Drag a straight board across the forms to level the surface, filling low spots as you go.
  4. Float and edge. Bull-float to smooth, run an edger along the forms, then cut or tool control joints about every 8–10 ft to steer the cracking.
  5. Finish and cure. Broom the surface for grip once the water sheen is gone, then keep it damp (or cover it) for several days — slow curing is what makes concrete strong.

Frequently asked questions

How much concrete for a 10x10 slab?
A 10 × 10 ft slab at 4 inches thick is about 1.2 cubic yards, or roughly 1.4 cubic yards once you add a 10% waste allowance.
How many bags make a cubic yard?
About 45 80-lb bags, 60 60-lb bags, or 90 40-lb bags, since a cubic yard is 27 cubic feet.
Should I use bags or ready-mix?
Bags suit small jobs like setting posts. For about a cubic yard or more, ready-mix delivery is usually cheaper and easier.
How thick should a concrete slab be?
4 inches for patios, walkways, and shed floors; 5–6 inches where vehicles or heavy loads sit. Thicker slabs usually want rebar or wire mesh too.
Do I need rebar or wire mesh?
For driveways and load-bearing slabs, yes — rebar or welded wire mesh controls cracking and adds strength. Thin walkways often get by with fiber-reinforced mix or mesh alone.
How long before I can walk or drive on it?
You can usually walk on it after about 24–48 hours, but wait roughly 7 days before heavy use and about 28 days for full cure strength.
How much extra should I order?
Add 5–10% for spillage and an uneven subgrade. Running short during a pour is a serious problem.
What's the best temperature to pour concrete?
Aim for about 50–80°F. In hot weather concrete sets too fast (pour early and keep it damp); below ~40°F it cures slowly and can freeze, so cold pours need blankets or an accelerator.
Why does concrete crack?
Mostly shrinkage as it cures, plus ground movement. You can't stop cracking entirely, but a compacted base, reinforcement, a not-too-wet mix, control joints, and slow curing keep cracks small and controlled.

How we calculate this

  • Volume = length × width × thickness, converted to cubic yards (1 cu yd = 27 cu ft)
  • Bag yields: an 80 lb bag ≈ 0.60 cu ft, 60 lb ≈ 0.45, 40 lb ≈ 0.30
  • A small overage is sensible for spillage and uneven subgrade

For footings, structural slabs, or anything load-bearing, confirm dimensions and reinforcement against your local building code or an engineer.

Sources: Bag-mix manufacturer yields and standard concrete practice. Last reviewed: June 2026. See our methodology for how we build every estimate.